May 4, 2011

Pool Construction Part 6

Today is Wednesday...the concrete for all the walks and patios gets poured on Friday. Then the landscaping needs finishing (bar included), the pool needs to be plastered, diving board installed, pump connected, etc.  Only then we can fill it up.  So there is still a lot to be done (we're in the 5th month now).  I think we'll be swimming by Memorial Day.

Here are pictures from last evening. Where there is a metal grating on the ground, patio will be poured. Where there is dirt, it will be landscaping.


Hot tub / Pool. The table and chairs are on the tanning ledge. Why? I have no idea.



















The patio walk from the driveway (on the left) and a landscaping bed (on the right).


















Of course Hudson found a can of chewing tobacco left behind by the construction guys.























Outdoor kitchen / bar area and the patio to the basement door.



















Stairs down to the fire pit.  The circle shows the position.
 

















H on the stairs. The stone is so pretty.



















Hudson looking in the fish pond. Have I mentioned I didn't want a fish pond?


















The family. 


















Mike has strep throat that he got from Link. He's grumpy.




























































(Oh these boys are so cute)

2 comments:

Dee ⚜️⚜️⚜️⚜️⚜️ said...

It's really coming along. I'm so impressed with the layout. You’re going to have some backyard.

Dee

hudsonsgranny said...

Great Pool but wonderful grandsons. I can hardly wait to see Hudson cannonball off the diving board.